- Section 1 "Explanatory Note";
- Section 2 "The scheme of the planning organization of the land plot";
- Section 3 "Architectural solutions";
- Section 4 "Structural and spatial planning solutions";
- Section 5 "Information about engineering equipment, engineering support networks, list of engineering and technical measures, content of technological solutions":
- subsection "Power supply system";
- subsection "Water supply system";
- subsection "Drainage system";
- subsection "Heating, ventilation and air conditioning, heating networks";
- subsection "Communication networks";
- subsection "Gas supply system";
- subsection "Technological solutions";
- Section 6 "Construction organization project";
- Section 7 "Project of organization of works on demolition or dismantling of capital construction facilities";
- Section 8 "List of environmental protection measures";
- Section 9 "Fire safety measures";
- Section 10 "Measures to ensure access for the disabled";
- Section 10(1) "Measures to ensure compliance with energy efficiency requirements and requirements for equipping buildings, structures and structures with metering devices for energy resources used";
- Section 11 "Estimates for the construction of capital construction facilities";
- Section 12 "Other documentation in cases provided for by federal laws":
- a list of civil defense measures, measures to prevent natural and man-made emergencies;
- measures to eliminate possible accidents during the construction and operation of the facility;
- industrial safety;
- declaration of industrial safety;
- organization and working conditions of employees;
- investment efficiency;
- declaration of fire safety.