• Section 1 "Explanatory Note";
  • Section 2 "The scheme of the planning organization of the land plot";
  • Section 3 "Architectural solutions";
  • Section 4 "Structural and spatial planning solutions";
  • Section 5 "Information about engineering equipment, engineering support networks, list of engineering and technical measures, content of technological solutions":
    • subsection "Power supply system";
    • subsection "Water supply system";
    • subsection "Drainage system";
    • subsection "Heating, ventilation and air conditioning, heating networks";
    • subsection "Communication networks";
    • subsection "Gas supply system";
    • subsection "Technological solutions";
  • Section 6 "Construction organization project";
  • Section 7 "Project of organization of works on demolition or dismantling of capital construction facilities";
  • Section 8 "List of environmental protection measures";
  • Section 9 "Fire safety measures";
  • Section 10 "Measures to ensure access for the disabled";
  • Section 10(1) "Measures to ensure compliance with energy efficiency requirements and requirements for equipping buildings, structures and structures with metering devices for energy resources used";
  • Section 11 "Estimates for the construction of capital construction facilities";
  • Section 12 "Other documentation in cases provided for by federal laws":
    • a list of civil defense measures, measures to prevent natural and man-made emergencies;
    • measures to eliminate possible accidents during the construction and operation of the facility;
    • industrial safety;
    • declaration of industrial safety;
    • organization and working conditions of employees;
    • investment efficiency;
    • declaration of fire safety.