Realized objects of LLC "ZION"

Name The number of the positive conclusion
1 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the Alushta sewage treatment plants" Sabada/ 00016-21/KME-16007
2 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the sewage treatment plants of the village Parthenitis" Pozdnyakov/00018-21/KME-16682
3 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the sewage treatment plants Rybachye" Tyumentseva/ 00019-21/KME-16708
4 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the sewage treatment plants Solnechnogorskoye" Pozdnyakov/00017-21/KME-16722
5 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the sewage treatment plants of the village. Primorsky" 00024-21/KME-17505
6 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the sewage treatment plants of the village. Gurzuf" Korzh/00206-21/KME-17514
7 Correction of design and survey work on the object: "Overhaul of the deep-sea release of sewage treatment plants Foros" Pozdnyakov/00208-21/KME-17504
8 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the Otradnoye sewage treatment plants" Pozdnyakov/00204-21/KME-17506
9 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the sewage treatment plants Simeiz" Korzh/00203-21/KME-17513
10 Correction of design and survey work on the object: "Overhaul of the deep-sea release of the Feodosiya sewage treatment plants" 91-1-1-2-011007-2022
11 Execution of design and survey work on the object: "Overhaul of the water pipeline from the Zhavoronki water treatment plants to the Veseloe pumping station and from the Veseloe pumping station to the Dzerzhinsky settlement with a length of 24 km Korzh/00171-21/KME-28943
12 Execution of design and survey work on the object: "Construction of protective hydraulic engineering structure to protect against flooding in the village of Priozernoye, Leninsky district, Republic of Crimea" 91-1-1-3-012976-2023
13 Execution of design and survey work on the object: "Reconstruction of the deep-water release of the sewage treatment plants Yevpatoria" 91-1-1-3-011281-2023
14 Execution of design and survey work on the object: "Reconstruction of the main pumping station Yalta " 91-1-1-3-050546-2023
15 Execution of works on the development of design and estimate documentation for the facility: Major repairs of the Emergency discharge of the hydraulic unit of the Front reservoir (PK 3168+45), Republic of Crimea, Leninsky district, Semisotskoye rural settlement 91-1-1-2-005927-2024
16 Execution of works on the development of design and estimate documentation for the facility: Major repairs of the Water pipe No. 20 Sovetsky district, Pushkinskoye rural settlement 91-1-1-2-001827-2024
17 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the blocking structure No. 5 (PK 2522+00) Sovetsky district, Chernozemnenskoye village 91-1-1-2-005236-2024
18 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the blocking structure No. 6 (PK 2782+35) Sovetsky district, Ilyichevskoye rural settlement 91-1-1-2-003345-2024
19 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the blocking structure No. 7 (PK 2934+70) Kirovsky district, Yarkopolenskoye village 91-1-1-2-005235-2024
20 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the Blocking structure No. 8 (PK 3041+69) Kirovsky district, Vladislavosvskoye 91-1-1-2-003695-2024
21 Execution of works on the development of design and estimate documentation for the facility: Overhaul of the Ducker of the hydroelectric complex of the Front reservoir (PK3168+45), Kirovsky district, Semisotskoye rural settlement 91-1-1-2-002246-2024
22 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the Emergency discharge of the hydraulic unit of the Front reservoir (PK 3168+45), located at the address: Republic of Crimea, Leninsky district, Semisotskoye rural settlement 91-1-1-2-005927-2024
24 Execution of works on the design of a deep-water outlet for a capital construction facility: “Construction of local surface runoff treatment facilities No. 4 (LST No. 4) with deep-water discharge in the area of Quarantine Bay, main collectors for collecting and diverting stormwater runoff to LST No. 4 and storm sewer networks in the area of Artillery Bay with automated underground compact sewage pumping stations (CSPS)” Only engineering surveys have been carried out
25 Execution of design and survey work on the deep-water release of the facility: Reconstruction of sewage treatment plants "Anapa" Only instrumental and technical examination was performed
26 Performing a survey of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Lazarevskoye" A diving examination has been performed
27 Performing engineering and technical reconnaissance for the presence of explosive objects (EO) with the development of the section of project documentation "Cleaning the area from EO" for the object: Reconstruction of sewage treatment plants "Aleksino". A report has been developed
28 Performing engineering and technical reconnaissance for the presence of explosive objects (EO) with the development of the section of the project documentation "Cleaning the area from EO" for the object: Reconstruction of sewage treatment plants "Dagomys" A report has been developed
29 Development of the volume "Assessment of the impact of planned economic and other activities on the environment (EIA) and calculation of environmental damage" for the object: Reconstruction of sewage treatment plants "Magadan" . A report has been developed
30 Development of project documentation for the facility: “Design and construction of the main water pipeline Chirkey-Makhachkala-Kaspiysk, Republic of Dagestan”, namely by stages: -Stage 3. “Construction of the main water pipeline from the pumping station of the III lift (exc.)-to the village of Agachaul (incl.)”, - Stage 4. “Construction of the main water pipeline from the village of Agachaul (excl.) – to the village of Novy Khushet (incl.)” Stage 3- 05-1-1-3-007405-2024, Stage 4- 05-1-1-3-009395-2024
31 Control over the work and performance of Construction control functions during construction and installation work at the building of the Joint-stock Company "All-Russian Scientific Research Institute for the Operation of Nuclear Power Plants", control over the implementation of author's supervision, production control over compliance with the requirements of project documentation during work at the facility, Moscow, Ferghanskaya str., 25, building 2
32 Control over the work and performance of Construction control functions during construction and installation work at at the building of the Joint-stock Company "All-Russian Scientific Research Institute for the Operation of Nuclear Power Plants", control over the implementation of author supervision, production control over compliance with the requirements of project documentation in the process of additional construction and installation works and landscaping at the facility, Moscow, Ferghanskaya str., 25, building 2
33 Project support for the facility: "Construction of a coastal base of ships in Sevastopol."
34 Execution of works on the development of design and estimate documentation for the facility: Major repairs of the Aqueduct: picket line 3376+55 - 3377+38 The North Crimean Canal, located at the address: Republic of Crimea, Leninsky district, Uvarovskoye rural settlement 91-1-1-2-047063-2024
35 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the Ducker through the Samarli river: picket line 3547+30 - PK 3564+50 The North Crimean Canal, located at the address: Republic of Crimea, Leninsky district, Vinogradnenskoye rural settlement 91-1-1-2-053877-2024
36 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the blocking structure No. 11 (picket line 3270+55) Leninsky district, Semisotskoye rural settlement 91-1-1-2-034574-2024
37 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the blocking structure No. 12 (picket line 3369+42) Leninsky district, Uvarovskoye rural settlement 91-1-1-2-034778-2024
38 Execution of work on the development of design and estimate documentation for the facility: Major repairs of the Blocking structure No. 13: picket line 3436+69 The North Crimean Canal, located at the address: Republic of Crimea, Leninsky district, Ilyichevskoye rural settlement 91-1-1-2-030922-2024
39 Execution of design and survey work on the object: "Reconstruction of the The North Crimean Canal of the village "Nikolaevka" Termination Agreement dated 03/27/2024
40 Additional examination of the sewage discharge collector at the facility: Construction of sewage treatment plants "Anchor Gap" Additional examination is completed

Realized objects of LLC "ZION"

1 Execution of design and survey works and execution of engineering surveys of the capital construction facility: “The system of protection of the city of Gelendzhik from surface runoff” In the process of implementation
2 Execution of design works on the object: "Creation of off-site water supply and sanitation networks for the facilities of the Primorsky Metallurgical Plant of the territory of advanced development "Bolshoy Kamen" In the process of implementation
3 Execution of design and survey work on the object: "Construction of a deep-sea outlet in the sea of the sewage treatment plants of the village "Oliva" In the process of implementation
4 Execution of design and survey work on the deep-water release of the facility: Reconstruction of sewage treatment plants "Adler" and reconstruction of sewage treatment plants "Kudepsta" In the process of implementation
5 Execution of design and survey work on the deep-water release of the facility: Reconstruction of sewage treatment plants "Bzugu" of the Khostinsky district and construction of a drainage system in the Central district (Bocharov Ruchey) In the process of implementation
6 Execution of design and survey work on the deep-water release of the facility: Reconstruction of sewage treatment plants "Tuapse" In the process of implementation
7 Execution of design and working documentation regarding the ducting of the discharge pipeline at the facility: Reconstruction of sewage treatment plants "Tuapse" In the process of implementation
8 Execution of design and survey work on the deep-water release of the facility: Reconstruction of sewage treatment plants "Gizel-Dere", "Shepsi" In the process of implementation
9 Execution of design and survey work on the construction of a deep-water outlet and a discharge collector for the facility: Reconstruction of sewage treatment plants "Gizel-Dere", "Shepsi" In the process of implementation
10 Execution of design and survey work on the deep-water release of the facility: Reconstruction of sewage treatment plants "Aleksino" In the process of implementation
11 Execution of design and survey work on the deep-water release of the facility: Reconstruction of sewage treatment plants "Dagomys" In the process of implementation
12 Execution of design and survey work on the deep-water release of the facility: Reconstruction of sewage treatment plants "Magadan" In the process of implementation
13 Execution of design and survey work on the deep-water release of the facility: Construction of sewage treatment plants "Anchor Gap" In the process of implementation
14 Performance of work on the inspection of the discharge collector of the facility: Construction of sewage treatment plants "Anchor Gap" In the process of implementation
15 Performance of works on diving inspection of deep-water discharge at the facility: Construction of sewage treatment plants "Anchor Gap" In the process of implementation
16 Execution of design and survey work on the discharge collector before deep-water discharge at the facility: Construction of sewage treatment plants "Anchor Gap" In the process of implementation
17 Execution of works on the design of engineering protection of the object's territory: "Construction of the sewage treatment plants "Anchor Gap" In the process of implementation
18 Execution of design and survey work on the object: "Construction of a coastal base of ships in Sevastopol" in terms of deep-sea release In the process of implementation
19 Performing engineering surveys of the route (underwater part) of the projected discharge collector at the facility: "Reconstruction of the Lazarevskoye sewage treatment plants" In the process of implementation
20 Correction of sections of the project documentation for the facility: "Construction of sewage treatment plants with deep-sea discharge into the sea in the village. Katsiveli, Yalta, Republic In the process of implementation
21 Correction of the project documentation of the facility: "Reconstruction of the wastewater disposal system of the village of Malorechesky in the Alushta city district of the Republic of Crimea" the sewage treatment plants Katsiveli In the process of implementation
22 Development of project documentation with the passage of state expertise and working documentation at the facility: "River manifold Pervinka" In the process of implementation
23 Execution of works on support in the expert organization of project documentation for the object: "Construction of a coastal base of ships in Sevastopol" In the process of implementation
24 Development of technical design/working documentation and, based on them, preparation of estimates for the technical re-equipment of the facility: "Technical re-equipment of water intake equipment" at hydroelectric power plants (HPP-1) - a branch of PJSC Mosenergo In the process of implementation
25 "Conducting engineering and technical reconnaissance for the presence of explosive objects (EO) with the development of the section of project documentation "Cleaning the area from EO" for the object: Construction of sewage treatment plants "Anchor Gap" Stage 2 - "Construction of the 1st stage of the complex of areal buildings and structures of the USC "Anchor
the gap." Construction of a discharge manifold and a deepwater outlet."
In the process of implementation
26 Drilling operations within the framework of engineering and geological surveys on the object: "Deep-water outlet, stormwater manifold with the installation of a sewage pumping stations and local treatment facilities in the village of Myshako" In the process of implementation
27 Drilling operations within the framework of engineering and geological surveys on the object: "Deep-water outlet, stormwater manifold with the device of the sewage pumping stations and local treatment facilities in the area of the yacht club of PJSC Novoship In the process of implementation
28 Drilling operations within the framework of engineering and geological surveys on the object: "Deep-water outlet, stormwater manifold with the device of the sewage pumping stations and local treatment facilities of Chernyakhovsky Street" In the process of implementation
29 Performing scientific and exploratory archaeological work along the deep-water discharge route: Reconstruction of sewage treatment plants in the village of Agoy of the Nebugsky rural settlement of the Tuapse district In the process of implementation
30 Performing scientific and survey archaeological work on the deep-water discharge route for the facility: Reconstruction of the Kabardinka sewage treatment plants In the process of implementation
31 Performing scientific and survey archaeological work along the deep-water discharge route for the facility: Reconstruction of the Lermontovo sewage treatment plants In the process of implementation
32 Performing scientific and survey archaeological work along the deep-water discharge route at the facility: Reconstruction of the Olginka sewage treatment plants In the process of implementation
33 Performing scientific and survey archaeological work along the deep-water release route for the facility: Reconstruction of the Tyumen sewage treatment plants In the process of implementation
34 Performing engineering and technical reconnaissance for the presence of/ absence of explosive objects along
the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants in the village of Agoy of the Nebugsky rural settlement of the Tuapse district
In the process of implementation
35 Performing engineering and technical reconnaissance for the presence of/ absence of explosive objects along
the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Kabardinka"
In the process of implementation
36 Performing engineering and technical reconnaissance for the presence of/ absence of explosive objects along
the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Lermontovo"
In the process of implementation
37 Performing engineering and technical reconnaissance for the presence of/ absence of explosive objects along
the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Olginka"
In the process of implementation
38 Performing engineering and technical reconnaissance for the presence of/ absence of explosive objects along
the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Tyumenskiy"
In the process of implementation
39 Performing engineering and geological surveys (seismic microdistricting) along the route of deep-water discharge at the facility: Reconstruction of wastewater treatment plants in the village of Agoy of the Nebugsky rural settlement of the Tuapse district In the process of implementation
40 Performing engineering and geological surveys (seismic microdistricting) along the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Kabardinka" In the process of implementation
41 Performing engineering and geological surveys (seismic microdistricting) along the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Lermontovo" In the process of implementation
42 Performing engineering and technical reconnaissance for the presence of/ absence of explosive objects along
the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Olginka"
In the process of implementation
43 Performing engineering and geological surveys (seismic microdistricting) along the route of deep-water discharge at the facility: Reconstruction of sewage treatment plants "Tyumenskiy" In the process of implementation

More than 200 people are involved in the implementation of contracts for design and survey work in terms of hydraulic structures